Chula Vista, California

Otay River Estuary Restoration Project Phase 1 & 2

PROJECT DESCRIPTION

The Otay River Estuary Restoration  Project (ORERP) site, located in Chula  Vista, National City, and San Diego,  California, occupied 165.4 acres. This  project created, restored, and enhanced  coastal wetlands to benefit native  fish, wildlife, and plant species, and  provided habitats for migratory seabirds,  shorebirds, and salt marsh-dependent  species within the South San Diego  Bay Unit of the San Diego Bay National  Wildlife Refuge. Poseidon Resources  (Channelside) LP (Poseidon) has been  working with the U.S. Fish and Wildlife  Service for almost 10 years to implement  the ORERP to provide mitigation for  impacts related to Poseidon’s Claude  “Bud” Lewis Carlsbad Desalination Plant  (Poseidon Desalination Plant) located in  Carlsbad, California. 

Phase 1 of the Otay River Estuary  Restoration Project (ORERP) consisted  of preconstruction services delivered by  Odin under a Construction Management at Risk delivery model. As a member of  the project’s Integrated Project Team  (IPT), Odin supported planning and risk mitigation efforts for the future  construction of the restoration features.  Phase 1 focused on constructability  reviews, value engineering, and  evaluation of regulatory, technical,  and schedule risks associated with  excavating, transporting, and placing  more than 300,000 cubic yards of  soil to construct a multi-part wetland  system restoring and revegetating seven  intertidal areas. Key considerations  addressed during Phase 1 included  regulatory constraints related to bird  nesting seasons, Stormwater Pollution  Prevention Plan requirements, permitting  for borrow areas and haul routes,  dewatering discharge limitations,  perimeter berm stability, foundation  settlement, and soil salinity segregation  to meet revegetation objectives. The IPT  also developed a 3D GPS-guided soil  model to optimize excavation precision, maximize soil reuse, and reduce material handling costs.  Upon completion of Phase 1 preconstruction services,  Odin was awarded a Guaranteed Maximum Price  contract to proceed with construction. 

Phase 2 of the Otay River Estuary Restoration Project  ORERP) features restoration at two different sites  located at the southern end of San Diego Bay. The first  site entailed restoration of the Otay River Floodplain,  accomplished through soil excavation of 307,000  cubic yards to lower the ground to elevations suitable  for coastal salt marsh habitat and construction of  a new berm exposing the area to tidal influence.  Soil excavated from the Otay River Floodplain was  transported to the second site (Pond 15 in the salt  ponds complex) in trucks and placed in Pond 15 to raise  the ground to elevations suitable for coastal salt marsh  habitat. The project also included the construction of temporary crossings over Nestor Creek, Otay River,  and Palomar Channel to allow construction equipment  access, soil amendments, and rock revetments. In  addition, a portion of the Otay River floodplain site  and a portion of land within the San Diego United Port  District former site of the South Bay Power Plant, 990  Bay Boulevard, Chula Vista was used for construction  staging and storage. The project had significant  environmental restrictions subject to compliance with  the Final Restoration Plan submitted to the California  Coastal Commission. Work in both the Pond 15 area  and the ORFS were subject to stringent environmental  monitoring conditions including prohibitions of  working during the bird nesting season. Biological,  archeological, and paleontological monitoring during  construction activities was required.

PROJECT HIGHLIGHTS

• CM@R delivery with early contractor involvement
• Large-scale wetland restoration, restoring and enhancing 165+ acres through precision excavation, soil reuse, and tidal reconnection
• 3D GPS-guided modeling and collaborative planning to reduce material handling and transition to a GMP construction contract

Project Details

START DATE:

September 2022

END DATE:

July 2025

VALUE:

$34.9M