PROJECT DESCRIPTION
The Otay River Estuary Restoration Project (ORERP) site, located in Chula Vista, National City, and San Diego, California, occupied 165.4 acres. This project created, restored, and enhanced coastal wetlands to benefit native fish, wildlife, and plant species, and provided habitats for migratory seabirds, shorebirds, and salt marsh-dependent species within the South San Diego Bay Unit of the San Diego Bay National Wildlife Refuge. Poseidon Resources (Channelside) LP (Poseidon) has been working with the U.S. Fish and Wildlife Service for almost 10 years to implement the ORERP to provide mitigation for impacts related to Poseidon’s Claude “Bud” Lewis Carlsbad Desalination Plant (Poseidon Desalination Plant) located in Carlsbad, California.
Phase 1 of the Otay River Estuary Restoration Project (ORERP) consisted of preconstruction services delivered by Odin under a Construction Management at Risk delivery model. As a member of the project’s Integrated Project Team (IPT), Odin supported planning and risk mitigation efforts for the future construction of the restoration features. Phase 1 focused on constructability reviews, value engineering, and evaluation of regulatory, technical, and schedule risks associated with excavating, transporting, and placing more than 300,000 cubic yards of soil to construct a multi-part wetland system restoring and revegetating seven intertidal areas. Key considerations addressed during Phase 1 included regulatory constraints related to bird nesting seasons, Stormwater Pollution Prevention Plan requirements, permitting for borrow areas and haul routes, dewatering discharge limitations, perimeter berm stability, foundation settlement, and soil salinity segregation to meet revegetation objectives. The IPT also developed a 3D GPS-guided soil model to optimize excavation precision, maximize soil reuse, and reduce material handling costs. Upon completion of Phase 1 preconstruction services, Odin was awarded a Guaranteed Maximum Price contract to proceed with construction.
Phase 2 of the Otay River Estuary Restoration Project ORERP) features restoration at two different sites located at the southern end of San Diego Bay. The first site entailed restoration of the Otay River Floodplain, accomplished through soil excavation of 307,000 cubic yards to lower the ground to elevations suitable for coastal salt marsh habitat and construction of a new berm exposing the area to tidal influence. Soil excavated from the Otay River Floodplain was transported to the second site (Pond 15 in the salt ponds complex) in trucks and placed in Pond 15 to raise the ground to elevations suitable for coastal salt marsh habitat. The project also included the construction of temporary crossings over Nestor Creek, Otay River, and Palomar Channel to allow construction equipment access, soil amendments, and rock revetments. In addition, a portion of the Otay River floodplain site and a portion of land within the San Diego United Port District former site of the South Bay Power Plant, 990 Bay Boulevard, Chula Vista was used for construction staging and storage. The project had significant environmental restrictions subject to compliance with the Final Restoration Plan submitted to the California Coastal Commission. Work in both the Pond 15 area and the ORFS were subject to stringent environmental monitoring conditions including prohibitions of working during the bird nesting season. Biological, archeological, and paleontological monitoring during construction activities was required.
PROJECT HIGHLIGHTS
• CM@R delivery with early contractor involvement
• Large-scale wetland restoration, restoring and enhancing 165+ acres through precision excavation, soil reuse, and tidal reconnection
• 3D GPS-guided modeling and collaborative planning to reduce material handling and transition to a GMP construction contract